Heating and Cooling Loads

By working closely with design teams we can evaluate proposed new-build designs or existing buildings to calculate the heating and/or cooling loads to assist in delivering the optimum services solution.

Prior to installing heating and cooling systems, building heat losses and heat gains should be calculated to ensure the equipment is sized correctly avoiding the use of unnecessary and costly energy.

By evaluating project designs and considering factors such as the building fabric performance, ventilation rates and heat gains, we can assess the heating and cooling loads for every space in the building.

Using local weather data we will ensure that heating and cooling equipment will be capable of meeting the desired temperatures in the building without being grossly oversized.

"

CCG Group have commissioned Carbon Futures to support our Construction and Off-Site Manufacturing divisions with energy and sustainability related advice.  They offer our team a wide range of consultancy services including energy analysis, design certification and thermal modelling resulting in an overall improvement to the performance, efficiency and delivery of our products.  We would have no hesitation in recommending their services and look forward to working with them on future projects.

CCG (Scotland) Ltd

"