This retrofit project for Riverside Scotland saw whole-house retrofit and upgrading works carried out on 30 units of existing social housing located in Kilwinning, North Ayrshire.
30 one-bedroom bungalows in Pennyburn were improved to reduce energy usage, lower tenant energy bills and make the properties heat-pump ready. The homes previously achieved EPC Band D, and this has now been improved to a Band B rating, following completion of the works. The project followed an archetype approach.
The retrofit design that was developed for this social housing project includes:
100mm non-combustible external wall insulation with eaves and verge roof extensions
Bonded Bead Cavity Fill Insulation
Attic insulation enhanced to 300mm as necessary to achieve a U-value of 0.16W/m2K
Roof Ventilation Measures
New Windows & Doors
Solar PV
Battery Storage
Mechanical Ventilation (dMEV)
Replacement cladding to front external stores
New Roof Finishes and Rainwater Goods
Additional Downpipes for Future Resilience
The work on this project was carried out in phases to suit funding availability, with all occupants remaining in their properties for the duration of the retrofit works.