Introduction

Anderston Regeneration Phases 4 & 5 was a large-scale £25 million regeneration project of 206 new-build flats, with a mixed tenure of social rent and mid-market rent for Sanctuary Scotland, located in Glasgow City Centre. The project was built by CCG (Scotland) Ltd and designed by Collective Architecture and represents the final two phases of a multi-phase masterplan for the regeneration of the Anderston estate.

Sustainability

Bronze

Phase 4 was designed to achieve Bronze level for sustainability under Section 7 of the 2013 Scottish Building Regulations using a fabric first approach.

Phase 5 was designed to achieve Bronze Active for sustainability under Section 7 of the Scottish Building Regulations, which was achieved by using solar photovoltaic panels (PV). This phase was also designed to achieve Silver Level Aspect 1 & 2 under Section 7 of the Scottish Building Regulations.

Remit

Carbon Futures worked with the design team to develop a cost-effective and practical energy and sustainability strategy for the development, utilising a fabric first approach through the use of CCG OSM’s Closed Panel Timber System, delivered to site complete with service batten with windows, doors and insulation pre-installed.

Additional services provided by Carbon Futures included Design Certification, Building Regulation Compliance, Energy Performance Certification and the provision of Sustainability Labels.

Design Team

Sanctuary Group
Client
Sanctuary Group
CCG (Scotland) Ltd
Contractor
CCG (Scotland) Ltd
Collective Architecture
Architect
Collective Architecture
Glasgow City Council
City Council
Glasgow City Council